The prescriptive requirements relate to size and spacing of anchors and methods of attachment, and are described in the following sections. Masonry veneers are typically designed using prescriptive code requirements that have been developed based on judgement and successful performance. The backing must be designed to support the lateral and in some instances the vertical loads imposed by the veneer in addition to the design loads on the wall, since it is assumed the veneer does not add to the strength of the wall. 2, 3).įor the purposes of design, veneer is assumed to support no load other than its own weight. Unless otherwise noted, veneer requirements are those contained in the International Building Code (IBC)and Building Code Requirements for Masonry Structures (refs. They differ by the method used to attach the veneer to the backing, as illustrated in Figure 1. There are basically two types of veneer-anchored veneer and adhered veneer. Backing material may be masonry, concrete, wood studs or steel studs. Veneers provide the exterior wall finish and transfer out-of-plane loads directly to the backing, but they are not considered to add to the load-resisting capacity of the wall system. Choose from the following options: upper wall, lower wall, upper wall and lower wall outline, upper wall outline and lower wall, or upper wall and lower wall.Veneer is a nonstructural facing of brick, stone, concrete masonry or other masonry material securely attached to a wall or backing. Changing How Pony Walls Display in Plan ViewsĪccess the Plan View Specification dialog to change how pony walls are displayed for the active plan view.If a monolithic slab foundation is generated, the room will receive a slab floor with curbs. When a foundation is generated based on the floor plan of Floor 1, a room on the first floor specified as either a Garage or Slab type will receive a stem wall or pier foundation with a slab floor and stem walls. Modifying Garage Floor and Stem Wall Heights.The lower part of the pony wall would consist of the concrete wall with a footing, while the upper part of the pony wall is a framed wall built to the first floor platform. Use posts, multiple copy, and other features in Chief Architect to create a structure raised on piers.Ī stepped foundation can be created in Chief Architect using pony walls that have been modified in a section view. Creating an Elevated Structure on Pilings.The concrete cutout for a door can be modified on the Framing panel of its specification dialog. Creating a Cutout for Doors in Concrete Walls.You will need to create sloped terrain and adjust the Building Pad Elevation and/or terrain data so that the terrain is at the appropriate height relative to the structure at both the high and low ends of the slope.Ĭreating a bell footing is a straightforward task using items from the Library Browser. They feature walls that are above ground at the lower end of the slope so that a door can be positioned above the terrain at that end. Walkout basements are a type of daylight basement typically located on sloped terrain. The inner wall should be specified as a Furred Wall on the Structure panel of the Wall Specification dialog. The 'Foundations' layer controls the display of all objects on Floor 0 in camera views, but does not affect floor plan view.įurred Walls are placed against the inside of a primary wall, typically an exterior wall. The display of foundation walls, slabs, curbs, piers and footings is controlled in the Layer Display Options dialog. Turning Off the Display of the Foundation in a Cross Section/Elevation View.
0 Comments
Leave a Reply. |